The G84 Gcode tapping cycle is the standard tapping cycle used for
the right hand thread in a hole. At the start of the cycle the normal spindle
rotation M03 must be In effect. For
tapping always R Level must be higher compared to the other cycles. The
feedrate and the spindle speed calculation very important for the tapping cycle
since there is a direct relationship between the spindle speed and the lead of
the tap.
Code line for G84 Tapping cycle:
N100 G98 (G99) G84 X… Y… R… Z… F…
Diagram for G84 Tapping cycle:
Steps for the G84 Tapping cycle:
2.
Rapid motion to the R level, i.e., to the top of
the hole position.
3.
Feedrate motion to the depth of the thread in Z
with Clockwise Spindle rotation (M03).
4.
Spindle rotation stop in bottom of hole.
5.
Spindle reverse rotation (M04) and back in
feedrate to R level.
6.
Spindle rotation Stop.
7.
Spindle rotation normal (M03) and Rapid retract
to the initial level (with G98) or Rapid retract to R level (with G99).