Search This Blog

Saturday, December 12, 2015

G83 Deep hole Drilling cycle


                        The deep hole drilling cycle (Standard Peck Drilling) is also known as peck drilling cycle. In this cycle the drill will be retracted to the clearance position of the hole after drilling the certain depth of cut. After retracting to clearance plane, this cycle retracts to the R level after each peck of drill and repeated until the total depth of the hole is achieved.

Code line for G83 Peck drilling cycle:


N100 G98 (G99) G83 X… Y… R… Z… Q… F…

Diagram for G83 peck Drilling cycle:



Steps for the G83 peck drilling cycle:


      1.       Rapid motion to XY position of the hole position.
      2.       Rapid motion to the R level, i.e., to the top of the hole position.
      3.       Feedrate motion to the depth by the amount of Q value in Z.
      4.       Rapid retract to R level.
      5.       Rapid motion to the previous drilled depth with clearance.
      6.       Point number 3, 4 and 5 repeated until the z depth of the hole is reached.
      7.       Rapid retract to the initial level (with G98) or Rapid retract to R level (with G99).

1 comment:

  1. Your post is really good. Useful content. Very helpful to me. we are leading Tools Suppliers in UAE

    ReplyDelete