Search This Blog

Saturday, December 12, 2015

G84 Tapping cycle


                                        The G84 Gcode tapping cycle is the standard tapping cycle used for the right hand thread in a hole. At the start of the cycle the normal spindle rotation M03 must be In effect.  For tapping always R Level must be higher compared to the other cycles. The feedrate and the spindle speed calculation very important for the tapping cycle since there is a direct relationship between the spindle speed and the lead of the tap.

Code line for G84 Tapping cycle:


N100 G98 (G99) G84 X… Y… R… Z… F…

Diagram for G84 Tapping cycle:


Steps for the G84 Tapping cycle:


 1.       Rapid motion to XY position of the hole position.
       2.       Rapid motion to the R level, i.e., to the top of the hole position.
       3.       Feedrate motion to the depth of the thread in Z with Clockwise Spindle rotation (M03).
       4.       Spindle rotation stop in bottom of hole.
       5.       Spindle reverse rotation (M04) and back in feedrate to R level.
       6.       Spindle rotation Stop.
       7.       Spindle rotation normal (M03) and Rapid retract to the initial level (with G98) or Rapid retract to R              level (with G99).

1 comment:

  1. Nuestro centro ofrece a nuestros clientes un sistema de pago conveniente y flexible.
    Con pago progresivo para el programa de maternidad subrogada.
    For More: maternidad subrogada precios












    ReplyDelete